COMPANY EXPERIENCE LIST

2012-2013

CLIENT : PT PUNJ LYOID INDONESIA

PROJECT & LOCATION: POWER PLANT 2 X 30 MW TANJUNG TABALONG SOUTH KALIMANTAN

SCOPE OF WORK:

  • NDT DIVISION

Testing, Ultrasonic Testing and Hardness Testing on various piping and Steel

  • PROCUREMENT DIVISION

Material supply such as pipe, tubing, pipe fitting, Flexible Hose, SS Connector, valve, winch, firefighting equipment and welding consumable.


2012-Now

CLIENT : TENARIS

PROJECT & LOCATION: SPIJ CILEGON

  • PROCUREMENT DIVISION

Material & consumable supply such as hollow pipe, bolt/nut, pipe fitting, valve, Silica Sand, for blasting and office Consumable


2012-2013

CLIENT : PT HANJUNG INDONESIA

PROJECT & LOCATION: BAIJI FURNACE, BANDAR LAMPUNG

  • SPECIALIST SERVICES PWHT

Perform Stablization Heat Treatment for Radiant Coil at temp 900-940 C


2012 – NOW

CLIENT : PT SHIPYARD MARINE INDONESIA (SMI)

PROJECT & LOCATION: SHIP FABRICATION – BOJONEGARA

  • NDT DIVISION

Testing, Ultrasonic Testing and Harness Testing on various ship Fabrication.

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic


2013 – NOW

CLIENT : PT HANJUNG INDONESIA

PROJECT & LOCATION: PETRONAS WHP FABRICATION – BANDAR LAMPUNG

SCOPE OF WORK :

  •  PROCUREMENT DIVISION

Material supply such as pressure gage, Ring Joint Gasket, PRV and etc.

  •  SPECIALIST SERVICES PWHT

Perform Post Weld Heat Treatment for piping Line.

  •  SPECIALIST SERVICES HYDROSTATIC TEST

Perform Hydrostatic Test for piping Line low and High Pressure


2012-2013

CLIENT : PT PETRO OIL TOOL

PROJECT & LOCATION: PETRO OIL TOOL – TANGERANG

SCOPE OF WORK :

  •  PROCUREMENT DIVISION

Pneumatic Tool supply


 2012 – NOW

CLIENT : CNR INTERNATIONAL

PROJECT & LOCATION: TENARIS – CILEGON

SCOPE OF WORK :

  • QA, INSPECTION, EXPEDITING, PROCUREMENT AND TECHNICAL SERVICE DIVISION

Supply Qualified Tubular Inspector to perform OCTG Inspection


2013 – NOW

CLIENT : PT KRAKATAU ENGINEERING

PROJECT & LOCATION: POSCO PROJECT – CILEGON

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic

Testing, Ultrasonic Testing and Harness Testing on various ship Fabrication.


 2013 – NOW

CLIENT : PT ADHI KARYA

PROJECT & LOCATION: PLTU TARAHAN PROJECT – LAMPUNG

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic

Testing, Ultrasonic Testing and Harness Testing on various ship Fabrication.


2013 – NOW

CLIENT : KOREATECH INSPECTION CO.LTD

PROJECT & LOCATION: POSCO PROJECT – CILEGON

SCOPE OF WORK :

  • QA, INSPECTION, EXPEDITING, PROCUREMENT AND TECHNICAL SERVICE DIVISION

Supply Qualified Tubular Inspector to perform Welding Inspection


2012 – NOW

CLIENT : PT DAEKYUNG HEAVY INDUSTRY

PROJECT & LOCATION: WORK SHOP PT DIHI

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, PMI, Penetrant Testing, Radiographic Testing, Ultrasonic Testing and Harness Testing on various ship Fabrication.


2012

CLIENT : PT MECHINDO EKA PRIMA

PROJECT & LOCATION: TANJUNG- KALSEL

SCOPE OF WORK :

  • QA, INSPECTION, EXPEDITING, PROCUREMENT AND TECHNICAL SERVICE DIVISION

Design & Perform Procedure Qualification Test (WPS/PPQT) for steel structure & piping fabrication including installation.


2013

CLIENT : PT WOIL INDONESIA

PROJECT & LOCATION: CIKUPA – BANTEN

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic Testing, Ultrasonic Testing and Harness Testing on various ship Fabrication.


 2012-2013

CLIENT : PT PEMUDA PRIMA HUSADA

PROJECT & LOCATION: TANJUNG PRIOK – BANTEN

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic Testing, Ultrasonic Testing and Harness Testing on various ship Fabrication.


2013

CLIENT : PT INDAH KIAT

PROJECT & LOCATION: SERANG BANTEN

SCOPE OF WORK :

  • EPC OFFSHORE & ONSHORE DIVISION

Fabrication and Installation line pipe and valve replacement during the shutdown.


2013- NOW

CLIENT : PT ADARO ENERGI

PROJECT & LOCATION: PLTU 2 X 30 MW TANJUNG TABALONG – KALSEL

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic Testing, Ultrasonic Testing and Harness Testing on various ship Fabrication.

  • QA, INSPECTION, EXPEDITING, PROCUREMENT AND TECHNICAL SERVICE DIVISION

Supply Qualified Inspector to perform Maintenance for piping, boiler & pressure vessel remaining wall thickness inspection.


 2013 – NOW

CLIENT : PT ZUG INDUSTRIES

PROJECT & LOCATION: POWER PLANT 2 X 7MW SUMBAWA-NTB

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic Testing


 2013- NOW

CLIENT : PT JURONG ENGINEERING LESTARI

PROJECT & LOCATION: POWER PLANT CIKAMPEK-JAKARTA

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic Testing, Ultrasonic Testing and Harness Testing on power plant fabrication and installation.


2013 – NOW

CLIENT : POOMWON PROFESSIONAL ENGINEERS CO.LTD

PROJECT & LOCATION: INDONESIA AREA

SCOPE OF WORK :

  • QA, INSPECTION, EXPEDITING, PROCUREMENT AND TECHNICAL SERVICE DIVISION

Supply Qualified Inspector to perform Quality control inspector monitors, tests and inspects all processes involved in the production of a product and product itself. He has to ensure the quality standards are met by every component of the product or service provided by a company.


2013- NOW

CLIENT : PT PP PERSERO TBK

PROJECT & LOCATION: POWER PLANT KRAKATAU DAYA LISTRIK

SCOPE OF WORK :

  • NDT DIVISION

Perform general Magnetic Particle Testing, Penetrant Testing, Radiographic Testing, Ultrasonic Testing and Harness Testing on power plant fabrication and installation.


2013 – NOW

CLIENT : PT HANJUNG INDONESIA

PROJECT & LOCATION: TAIF PROJECT – BANDAR LAMPUNG

SCOPE OF WORK :

  •  SPECIALIST SERVICES HEAT TREATMENT

Perform Post Weld Heat Treatment for piping Line and stabilization.


2013 – NOW

CLIENT : PT INDONESIA POWER/ PLTU SURALAYA

PROJECT & LOCATION: PLTU SURALAYA

SCOPE OF WORK :

  • SPECIALIST SERVICES PWHT

Perform Post Weld Heat Treatment for piping Line.


2013 – NOW

CLIENT : PT ALSTOM POWER ENERGY SYSTEM INDONESIA

PROJECT & LOCATION: PT ALSTOM POWER ENERGY SURABATYA

SCOPE OF WORK :

  • SPECIALIST SERVICES PWHT

Perform Post Weld Heat Treatment for piping Line.


 2013 – NOW

CLIENT : PT TIMAS SUPPLINDO

PROJECT & LOCATION: PERTAMINA HULU ENERGY (OFFSHORE)

SCOPE OF WORK :

  • SPECIALIST SERVICES PWHT

Perform Post Weld Heat Treatment for piping Line.